Reef Resort Grounds and
Maintenance Sub-committee
Monthly Report for September 2019
Prepared by Chris Dahlberg
Scheduled Meetings
Dana Clark expressed concern for the following:
10 Sep 19
1. Plants at the entrance not done.
2. Pool chairs need repair.
18 Sep 19
1. B-B-Q's not working.
2. Water wastage. Complaints from resident and guests.
24 Sep 19
All matters above have been attended to.
I asked Dana to remind Troy that the damage to the stonework at the
central building needs to be done.
Troy provided the contact details for Council's waste manager so that I
could contact him to discuss the grease trap. He, Paul Wrobel confirmed
we need to update our system and has given us 4 months to have it done.
Bin Cages
A bin cage has been installed at the back of Villa 27. Kevin Craggs can
be seen putting the finishing touches to it.
This will allow us to measure how far the cages will need to be offset
from any structures. The photo may be of use in the newsletter?
Main Entrance - Port Douglas Road
The entrance had been watered daily from 6 September up until the level
1 water restrictions came into force on Tue 23 Sep. It is still being
watered but only three times a week.
The bushes at the road side of the entrance have been pruned and plants
added. The shared bike and walking path is a lot easier to see now, as
are the safety signs and more people are using it rather than taking a
short cut along the train lines. A quick survey showed usage of the
shared path has gone from 20% to 50%.
Images of four faded traffic signs have been passed to Queensland
Transport for their consideration to replace?